© 2009 Integrated Engineering, LLC; 2160 Esten Road; Quakertown, PA 18951; Ph: 267-




Due Diligence is THE most important part of Land Development. Basic Due diligence can tell you: Current zoning constraints; proposed zoning changes; what kind of environmental (tree, wetlands, etc) regulations are you going to be faced with; existing road and traffic conditions and potential road improvements; and existing storm drainage issues.
An expanded due diligence can tell you about: possible environmental contamination; infiltration ability of the soils; depth to bed rock; etc. The more that you know about a property before the full engineering design process begins, the less you will need to spend on design and construction later in the process.
This is the meat and potatoes of what Integrated Engineering, LLC does. Our office has years of experience in design (storm water; erosion and sedimentation control, NPDES permits, etc) and value engineering.
Our goal is to provide you with a quality product that can be constructed at a minimal cost.
* Services provided by affiliated companies
The ability to Re-
